WATER INDUSTRY

Water is the most valuable resource on the planet and as such we must take good care of it. This is why environmental protection has been one of the key fields of our development. We have implemented a vast number of electrical & automation systems for tappable and wastewater. From the upgrade of existing plants to the development of new ones. Our solutions are equally present in municipal and industrial applications.

We offer reliable electrical and automation services for our partners. Whether you are an End-User or a Main Contractor. Our offer includes a single-source solution. With our expertise we cover each step of water treatment:

OUR SOLUTIONS
CASE STUDY
AKTOR, WWTP KRUŠEVAC, Serbia 2020
Previous slide
Next slide

PROJECT:

A new wastewater treatment plant and sewerage network in Kruševac was investment of 14.3 million euros. It has capacity to serve an equivalent population of 90,000 inhabitants, with a maximum daily flow of 45,500 m3 (526 1/s).

The total value of the project is 24 million Euros, and its funded by Germany’s KfW Development Bank.

Wastewater Treatment Plant (WTP) in Krusevac contains: mechanical pre-treatment of wastewater, primary wastewater treatment, biological-chemical wastewater treatment (secondary and tertiary), sludge treatment and exploitation of the produced biogas.

OUR CONTRACT:

MORAVA – VELIKA PLANA WATERWORKS, Serbia 2016
Previous slide
Next slide

PROJECT:

Construction of the Water treatment plant (WTP) Trnovce represents a stage of a larger project named Morava Regional Water Supply funded by the EU.

The plant processes raw water from the system of wells in Trnovce. With the capacity extension from 100 l/s to 200 l/s, the plant now provides fresh water for appx. 110,000 inhabitants. 

OUR CONTRACT:

BUDVA WATERWORKS AND SEWERAGE, Montenegro 2016
Previous slide
Next slide

PROJECT:

The Public Communal Company Waterworks and Sewerage Budva was dealing with the diffuclties with inefficiency and inability to have precise monitoring and control in the water supply. The problem occurred due to highly distributed network of water pumping stations. We offered solution for integrated monitoring of the water supply facilities performed through cloud-based web application.

The web application allows real-time monitoring and an advanced alarm system allowing faster and simpler detection of a potential point of failure in the water supply network. The application – WAC (Web Access and Monitoring) has simplified implementation and low maintenance costs. It provides great possibilities for analyses and planning in the Water Supply System.

Integration of the distributed facilities was performed through the cloud-based web application. The web application allows real-time monitoring and an advanced alarm system.

OUR CONTRACT:

PORR D.O.O. AND UNIHA WASSER TECHNOLOGIE GMBH, Serbia 2011-2013

PROJECT:

In 2016 Uniha Wasser Technologie GmbH with Porr d.o.o. started building the Water Treatment Plant for the City of Smederevo – WTP Salinac.

Construction project of the WTP Salinac is a part of an upgrade project of the water supply system for over 25,000 citizens of the city of Smederevo and nearby villages. The plant has the capacity of 200 l/s, and its construction is financed by the funds of KfW bank.

We’ve engaged in this project with delivering a complete electrical and automation equipment on a turnkey basis.

OUR CONTRACT:

Previous slide
Next slide

PROJECT: AKTOR

A new wastewater treatment plant and sewerage network in Kruševac was investment of 14.3 million euros. It has capacity to serve an equivalent population of 90,000 inhabitants, with a maximum daily flow of 45,500 m3 (526 1/s).

The total value of the project is 24 million Euros, and its funded by Germany’s KfW Development Bank.

Wastewater Treatment Plant (WTP) in Krusevac contains: mechanical pre-treatment of wastewater, primary wastewater treatment, biological-chemical wastewater treatment (secondary and tertiary), sludge treatment and exploitation of the produced biogas.

OUR CONTRACT:

Previous slide
Next slide

PROJECT: MORAVA

Construction of the Water treatment plant (WTP) Trnovce represents a stage of a larger project named Morava Regional Water Supply funded by the EU.

The plant processes raw water from the system of wells in Trnovce. With the capacity extension from 100 l/s to 200 l/s, the plant now provides fresh water for appx. 110,000 inhabitants. 

OUR CONTRACT:

Previous slide
Next slide

PROJECT: BUDVA WATERWORKS AND SEWERAGE

The Public Communal Company Waterworks and Sewerage Budva was dealing with the diffuclties with inefficiency and inability to have precise monitoring and control in the water supply. The problem occurred due to highly distributed network of water pumping stations. We offered solution for integrated monitoring of the water supply facilities performed through cloud-based web application.

The web application allows real-time monitoring and an advanced alarm system allowing faster and simpler detection of a potential point of failure in the water supply network. The application – WAC (Web Access and Monitoring) has simplified implementation and low maintenance costs. It provides great possibilities for analyses and planning in the Water Supply System.

Integration of the distributed facilities was performed through the cloud-based web application. The web application allows real-time monitoring and an advanced alarm system.

OUR CONTRACT:

PROJECT: PORR D.O.O. AND UNIHA WASSER TECHNOLOGIE GMBH

In 2016 Uniha Wasser Technologie GmbH with Porr d.o.o. started building the Water Treatment Plant for the City of Smederevo – WTP Salinac.

Construction project of the WTP Salinac is a part of an upgrade project of the water supply system for over 25,000 citizens of the city of Smederevo and nearby villages. The plant has the capacity of 200 l/s, and its construction is financed by the funds of KfW bank.

We’ve engaged in this project with delivering a complete electrical and automation equipment on a turnkey basis.

OUR CONTRACT: